The first phase is to put in pipelines of varying sizes, both mains and distribution pipes. The second phase is to put in a holding tank, a storage reservoir with a capacity of 1.1 million litres (approximately 250,000 gallons). This phase also incorporates the installation of a pumping station.
-Peter Clarke
Select a background
More quotes by Peter Clarke
Popular Authors
A curated listing of popular authors.