4 Quotes by Mike Tudor

  • Author Mike Tudor
  • Quote

    We didn't have enough business for that line, so we shut it down at the end of 2002.

  • Tags
  • Share

  • Author Mike Tudor
  • Quote

    We originally designed it to do 50,000 (barrels a day). We've managed to run the line rate higher than 66,000, so the future looks pretty bright for this right now.

  • Tags
  • Share


  • Author Mike Tudor
  • Quote

    This is the first time that Canadian crude oil has been delivered to a Gulf Coast pipeline.

  • Tags
  • Share